Skip to content

Futures ​

Common things to remember:

  • A forward or futures contract is priced so that its value at t0 is 0 for both sides: neither side pays to enter.
  • After that, a forward's value moves with the underlying, and is only realized at maturity. A futures contract is marked to market daily: gains and losses are settled in cash each day, so its value resets to 0 after every settlement.
  • The two sides always sum to zero: what the long gains, the short loses.

Forward ​

  • No-arbitrage principle: the law of one price. Two ways of owning the asset at T (buy it now and carry it, or agree today to buy it at T) must cost the same.

Pricing ​

The forward price is the spot price carried forward at the risk-free rate:

F0(T)=S0(1+rf)T

or, with continuous compounding, F0(T)=S0erfcT, where S0 is today's spot price of the underlying and T is the time to maturity in years.

Carry Arbitrage Model ​

If the forward price differs from the no-arbitrage price, either borrow money or borrow the asset to lock in a riskless profit:

  • F0(T)>S0(1+rf)T: cash-and-carry. Borrow S0 at rf and buy the asset at t0, and sell it forward. At T, deliver the asset at F0(T) and repay S0(1+rf)T, keeping the difference.
  • F0(T)<S0(1+rf)T: reverse cash-and-carry. Borrow the asset and sell it short, invest the proceeds at rf, and buy forward. At T, buy the asset at F0(T) to return it, and keep S0(1+rf)T−F0(T).

Valuation ​

Zero Sum Game (Fundamental of Future): Vl,t+Vs,t=0

For the forward, at time t between 0 and T:

  • Vl,t=St−F0(T)(1+rf)T−t: the asset is worth St, and the long owes F0(T) at T. Equivalently, Vl,t=Ft(T)−F0(T)(1+rf)T−t, since St=Ft(T)(1+rf)T−t (see pricing).
  • Vs,t=F0(T)(1+rf)T−t−St

Update the pricing with benefits and costs of holding the asset (e.g., dividends or coupons are benefits; storage is a cost):

F0(T)=(S0−PVB+PVC)×(1+rf)T

Equivalently, with the benefits and costs carried forward to T:

F0(T)=S0(1+rf)T−FVB+FVC

Generally, at time t between 0 and T:

Vl,t=(St−PVB+PVC)−F0(T)(1+rf)T−tVs,t=F0(T)(1+rf)T−t−(St−PVB+PVC)

Note that only the costs and benefits from time t to T should be considered, discounted to t.

Example ​

Assuming a forward contract 100 days until maturity on a stock, the stock price is $45 and expected to pay dividends of $0.3 in 20 days, and $0.5 in 75 days. The risk free rate is 4%. After 40 days, the stock price is $48.

  1. Calculate the no arbitrage price of forward using the updated pricing formula:

    F0(T)=(45−0.31.0420365−0.51.0475365)×1.04100365=$44.68.
  2. Calculte the value for long:

    ST−F0(T)=$3.11

Fixed-Income Forwards and Equity Forwards ​

Fixed Income ​

Pricing ​

For a bond, the benefit is its coupons:

F0(T)=(S0−PVCoupon)×(1+rf)TF0(T)=S0×(1+rf)T−FVCoupon

Valuation ​

Vl,t=(St−PVCoupon)−F0(T)(1+rf)T−tVs,t=F0(T)(1+rf)T−t−(St−PVCoupon)

NOTE

St−PVCoupon=Ft(T)(1+rf)T−t, similarly by the original formula for forward pricing. So the value can also be written from the change in the forward price: Vl,t=Ft(T)−F0(T)(1+rf)T−t.

Example ​

One month ago, BM had a short position for five euro-bond forward contracts with 2 months to expiration and a contract notional of €100,000 each at price 145. The euro-bond forward contract now is 148. The risk-free rate is 0.1%. Calculate the value of BM's position.

  • Judge first: Short position and price rise → negative value
  • Vs,t=(F0(T)−Ft(T))(1+rf)T−t=145−1481.001112=−2.9997
  • VBM=Vs,t×100,000100×5=−14,998.5.

Equity ​

Pricing ​

For a stock, the benefit is its dividends:

  • F0(T)=(S0−PVDiv)×(1+rf)T.
  • F0(T)=S0×(1+rf)T−FVDiv.

NOTE

Dividends are less certain than coupons: they are forecasts, not contractual payments.

Specifically, for equity index futures, we use continuous compounding for the pricing formula above, with the index's dividends as a continuous yield:

F0(T)=S0×e(rfc−δc)T

where δc is the continuously compounded dividend yield.

TIP

rfc=ln⁡(1+rf), so erfcT=(1+rf)T.

NOTE

When rfc>δc, we have F0(T)>S0, and the futures curve is in contango; when rfc<δc, F0(T)<S0 and it is in backwardation.

Valuation ​

In general case at time t, the valuation is:

  • Vl,t=Ste−δc(T−t)−F0(T)e−rfc(T−t).
  • Vs,t=F0(T)e−rfc(T−t)−Ste−δc(T−t).

Both rfc and δc are the same continuously compounded rates throughout the formula.

NOTE

Ste−δc(T−t)=Ft(T)e−rfc(T−t)

Example ​

Assume a future contract on DJIA index with 100 days, Currently, DJIA is at 21000 with continuous dividend yield is 2%,The continuous compounded risk free rate is 3.2%. After 75 days, DJIA is at 20,050. Calculate the valuation of the futures contract to the long position.

  1. Calculate the no-arbitrage price of the future contract:

    F0(T)=S0e(rfc−δc)T=21000e1.2%100365=21069.15
  2. Discount to time t to calculate the value.

    Vl,t=St×e−δ(T−t)−F0(T)e−rfC(T−t)=20,050e−2%25365−21,069.15e−3.2%25365=−1004.8

Forward Rate Agreement ​

WARNING

In the context of FRA, we are using simple interest instead of compounding.

Def: A forward rate agreement (FRA) is an OTC forward contract whose underlying is a floating interest rate, such as MRR (formerly Libor). The long side effectively locks in a fixed rate to borrow at in the future.

  • Long: Pay Fix, Receive Float. Gains if the rate rises.
  • Short: Pay Float, Receive Fix. Gains if the rate falls.

Notation: The notation of FRA is a×b FRA, where a is the number of months until the contract expires (the floating rate is set and the FRA settles), and b is the number of months until the underlying notional loan matures. The underlying rate covers b−a months.

Use: FRAs are used to hedge the risk of future borrowing or lending. The side depends on the natural position: a future borrower fears rising rates and goes long; a future lender fears falling rates and goes short.

Pricing ​

The FRA rate is the forward rate implied by today's spot rates:

1+Sbb12=(1+Saa12)×(1+FRb−a12)

where Sa,Sb are the spot rates for a and b months, observed now.

Example ​

The 6-month spot rate is 1.5% and 9-month is 1.75%. Calculate the 6×9FRA rate.

  • (1+1.5%×0.5)(1+r4)=1+1.75%×0.75
  • r=2.22%

Valuation ​

NOTE

The interest saving due to FRA position comes at time b but is settled at time a. Always draw timeline when calculating valuation.

  • At expiration (t=a): the floating rate rfloat for the loan from a to b is now known. The interest difference is earned at b, so discount it back over b−a at that same rate:
Vl,a=NP×(rfloat−rfix)×b−a121+rfloat×b−a12

where rfix is the forward rate in the contract.

  • Common case, at time t between 0 and a: replace rfloat with the forward rate from a to b observed at t, FRt, to get the gain at time b. Then discount it to t with the spot rate Sb−t for the b−t months remaining:
Vl,t=NP×(FRt−rfix)×b−a121+Sb−t×b−t12

Example ​

For 1×4FRA, NP is 1m, underlying rate is 90-day LIBOR. The forward rate is 7%.

At t=30 days, underlying rate is 8%. Calculate the payment value of this FRA.

The time is already at settlement (1 month). We can directly use the formula to calculate:

Vl,t=1×1%×0.251+0.25×8%=2450.98

Fixed Income Futures ​

Accrued Interest ​

The price of a bond is quoted as a clean price (flat price), without accrued interest. The buyer pays the full (dirty) price, which adds the accrued interest:

AI=tTPMT

where t is the number of days since the last coupon, T the number of days in the coupon period, and PMT the coupon payment.

Delivery ​

IMPORTANT

This part should be focused for the exam

A fixed-income futures contract allows the short to deliver any bond from a basket of eligible bonds (the delivery option). Allowing a basket prevents squeezes in any single, possibly illiquid, issue.

The futures price is quoted for a hypothetical standard bond, since what is actually delivered is one of a basket of bonds. For US Treasury bond futures, the standard bond has a 6% coupon.

Pricing ​

Since the underlying asset is hypothetical, a conversion factor (CF) adjusts each deliverable bond's price, in an effort to make all deliverable bonds roughly equal in price. On delivery, the short receives:

Invoice price=Futures price×CF⏟principal invoice amount+AI

The adjustment is not exact, so one bond is the cheapest-to-deliver (CTD): the one that costs the short least to buy and deliver, relative to what it receives. The futures price follows the CTD bond.

Setting the invoice price equal to the forward price of the CTD bond (no arbitrage), where S0 is the bond's full price today (clean price plus AI0) and AIT is the accrued interest at the futures' maturity:

Futures price=FV−AITCF

where FV is the forward value of the bond:

FV=(S0−PVC)(1+rf)T=S0(1+rf)T−FVC

Example ​

The underlying asset is now $108 and the AI now is $0.083, The bond futures contract matures in 1 month. At expiration, AI will be $0.25. Assume CF=0.729535 and current one-month risk-frese rate is 0.1%. Calculate the price of the bond futures

Given formula above, it is

(108.083×(1+0.1%)1/12−0.25)0.729535=147.82

Interest Rate Swap ​

NOTE

In financial markets, the interest rate swap has the largest trading volume of any derivative.

In this context, we are discussing the plain vanilla interest rate swap: fixed for floating, in one currency, on a notional principal that is never exchanged. Similar to the FRA:

  • Long position (payer swap): Paying fix, receiving float
  • Short position (receiver swap): Paying float, receiving fixed

The floating rate payments are made in arrears: each rate is determined at the start of its period and paid at the end.

Relationship with previous instruments ​

  • Forwards: a swap is a series of forward contracts, all in the same direction, all at the same fixed rate. Because one rate is used for every date, each forward on its own is off-market (non-zero value); only the sum is worth zero at initiation.
  • Bonds: taking a swap as a combination of bonds is the fundamental view of swap pricing. The long position (pay fixed) is a short position in a fixed-rate bond plus a long position in a floating-rate bond.
  • FRA: a swap is like a series of FRAs, one per period, all at the same fixed rate.

Pricing ​

WARNING

The swap rate needs to be annualized using simple interest.

Same as all futures and forwards, the value of the contract at time 0 should be 0 for both sides, and all pricing and valuation use simple interest.

Pricing a swap means finding its fixed rate: the one fixed side of the obligation.

IMPORTANT

Assumption: The floating rate bond's coupon rate is equal to the market rate, and the pay in arrears mode is applied.

Then on each reset day and initial day, the floating bond price is equal to its par

By the note above, since V0=0, PVfix=PVfloat=Par.

Assume F is the periodic coupon of a fixed-rate bond with a par of 1. Then

1=∑i=1nFDi+1×DnF=1−Dn∑i=1nDi

where Di is the discount factor for payment i under simple interest, 11+ri×daysi360. F is a periodic rate; multiply by the number of periods per year to annualize it.

Example ​

Price the quarterly-pay plain vanilla swaps. The LIBOR spot rates are R90-days=2.5%,R180-days=3%,R270-days=3.5%,R90-days=4%.

First we calculate all discount factors under simple interest:

D1=11+2.5%×90360=0.9938D2=11+3%×180360=0.9852D3=11+3.5%×270360=0.9744D4=11+4%×360360=0.962

Now, getting F with the formula above:

F=1−D4D1+D2+D3+D4=0.98%

The swap rate should be annualized by:

r=0.98%×4=3.92%

Usage ​

Swap for hedging: a borrower paying a floating rate can enter a pay-fixed swap: the floating payments cancel, and the borrower is left paying a fixed rate. A lender receiving floating can likewise enter a receive-fixed swap.

NOTE

The swap must match the exposure: if the floating exposure doubles, the swap's notional principal must double too.

Valuation ​

  • Vl,t=PVfloat−PVfix
  • Vs,t=−Vl,t

First we calculate the fixed rate F with the formula above, then:

  • For the fixed side, discount the remaining fixed coupons F and the par to t.
  • For the floating side, the bond returns to par at the next reset date, so discount the par plus the next floating coupon, which was already set at the last reset, from the next reset date to t.

Example ​

Following example in pricing above, let the Libor at T=30 to be:

R60-days=3%,R150-days=3.5%,R240-days=4%,R330-days=4.5%

Calculate the value for long position

We first calculate discount factors:

Da=11+3%×60360=0.9950Db=11+3.5%×150360=0.9856Dc=11+4%×240360=0.9740Dd=11+4.5%×330360=0.9604

Then discount them to t with simple interest:

Vfix=0.98%(Da+Db+Dc+Dd)+1×Dd

The discount the par and the pre-determined float rate at 90 days to get the float value:

Vfloat=(1+903602.5%)×Da=1.001219

NOTE

Here we use the rate of the previous example (2.5%) because swap is pay in arrear, which means rate is determined at the beginning of each period.

The value is then NP×(Vfloat−Vfix).

Valuation Method 2 ​

Imagine at time t signing a new, offsetting swap at today's fixed rate. The floating legs cancel, leaving the difference in fixed rates on the remaining dates. So the value of the long position is:

Vl,t=NP×(Ft−F0)×∑iDi

where F0 is the fixed rate in the contract, Ft the fixed rate of a new swap with the same remaining maturity at t (as periodic rates), and Di the discount factors for the remaining payment dates.

This valuation rests on the floating legs being identical: the future floating cash flows are the same for both swaps, and the new swap's value is 0, so Ft prices the floating leg.

NOTE

This formula is the same as for a forward: the change in the price (here, the fixed rate), discounted.

Example ​

2 years ago, we entered an annual-reset $100m 7-year receive-fixed interest rate swap, with fixed swap rate of 2%.

The estimated PV factors are given in the following table. Calculate the value for the party receiving fixed rate:

Maturity (years)PV Factors
10.990
20.978
30.965
40.952
50.938

Now, making clear that we are calculating value for short position, which is:

Vs,t=∑PV(F0−Ft)

Then, calculate Ft with the pricing formula;

Ft=1−Dn∑i=1nDi=1.29%

Then the value is:

Vs,t=((2%−1.29%)∑i=1nDi)NP

where NP is $100m.

Currency Swap ​

A currency swap is another form of interest rate swap, but each leg uses the interest rate of its own currency. It involves:

  • Exchanging the principals at the beginning, at the spot exchange rate, and returning them at termination
  • On settlement dates, interest payments are not netted, because they are in different currencies
  • Floating rate payments are typically made in arrears

IMPORTANT

The currency exchange rate used for the principals is the exchange rate at the beginning; the same principals are exchanged back at termination.

Pricing ​

For currency swaps, there are 4 potential modes:

  • Pay fixed, Receive fixed
  • Pay float, Receive fix
  • Pay fix, Receive float
  • Pay float, receive float

For the Fix/Float pattern, we still use Vfix=Vfloat: consider each bond to be 1 at par, and use the same formula as for interest rate swaps, F=1−Dn∑Di, with that currency's discount factors.

For the Fix/Fix pattern, set the principal of each side to 1 and use the same formula, once per currency (since we are calculating rates, the principal can be set at any value).

For the Float/Float pattern, there is no fixed rate to solve for.

Valuation ​

Take the contract as long one bond and short another, in different currencies. Value each bond in its own currency, then convert one to the other's currency at the current spot exchange rate. The rest is the same as the first method for interest rate swaps.

Equity Swap ​

An equity swap is another form of swap, exchanging the return of a stock or an index (dividends and price changes) for a fixed or floating rate, or for the return of another equity.

Exchanging all returns, dividends included, is called a Total Return Swap.

Usage ​

  • Speculating
  • Asset Allocation
  • Leveraging (Borrow money and enter an Equity Swap)
  • Change position (gain exposure when unable to buy the stock or its options)

Pricing ​

The fixed rate is priced with the same formula as for an interest rate swap: the equity leg, like a floating leg, is worth par at each reset.

Valuation ​

Let St−1 be the equity price at the last reset date. For the side receiving fixed rate and paying the equity return:

Vt=PVfixed bond−StSt−1NP

For the side receiving float rate and paying the equity return:

Vt=PVfloat bond−StSt−1NP

For the side receiving one equity return and paying another:

Vt=(R1−R2)NP

where R1 and R2 are the two equities' returns since the last reset.